Altair
Master Assassin
- Joined
- Feb 25, 2018
- Messages
- 5,590
- Reaction score
- 2,066
My day starts at 6AM. I get to work at 6:30 ish.
A cuppa tea and a chat then it's all hand on.
I replaced the rear brake shoes on a 44 Ton Tractor unit. Took 2 hours to get the wheel nuts off. Seized on the buggers.
A 44 Ton Tractor Unit looks a bit like this.

That took until 1PM to finish. Then I got called out to fix a Brand New JCB3 CX. The driver got the rear legs stuck in the Down position and didn't know how to get them back up again.!
This is a JCB3 CX.

This is what I have been doing today.
What about You?.
A cuppa tea and a chat then it's all hand on.
I replaced the rear brake shoes on a 44 Ton Tractor unit. Took 2 hours to get the wheel nuts off. Seized on the buggers.
A 44 Ton Tractor Unit looks a bit like this.

That took until 1PM to finish. Then I got called out to fix a Brand New JCB3 CX. The driver got the rear legs stuck in the Down position and didn't know how to get them back up again.!
This is a JCB3 CX.

This is what I have been doing today.
What about You?.